Ravensthorpe Nickel Project - Water Pump Packages
With the acquisition of the Ravensthorpe Nickel mine, First Quantum Minerals Ltd (FQM) have contracted Dynapumps to supply new seawater transfer pump skids and additional solution pump packages.
These additional pumps will help FQM complete plant construction to their specific requirements and standards.
Complete pump packages are an important aspect of developing a mine site as they are engineered to tailor the right flow rates and specific requirements of the media being pumped.
Turnkey pump packages give the customer peace of mind when planning civil and mechanical works prior to delivery due to known dimensions of the complete package. They also offer a significant cost saving as the package is supplied fully tested and requires minimal labour input for installation.
The previous supply of water pump sets data is below:
Client: BHP Billiton
Contractor: RJV
Project: Ravensthorpe Nickel Mine
Application: Water Pump Packages up to 600KW
Quantity
|
60 Water Pump Sets
|
Power
|
Up to 600 kW
|
Pumps Make
|
Sulzer, Grundfos
|
Materials
|
SAF2507 Super Duplex
Stainless Steel
|