Fire pump set details:

  • Duty: 144m3/h @ 90m
  • Electric / Diesel / Jockey Pump to AS2941-2013
  • Electric Pump: Grundfos NKG HD 125x80-250 with WEG 75kW Motor
  • Diesel Pump: Grundfos NKG HD 125x80-250 with VM Motori 754TPE2 73.5kW Diesel Engine
  • Jockey Pump: Grundfos CRI 1-19 with WEG 1.1kW Motor
  • Pipework: 6" Suction and Discharge Victaulic Pipework and Valves