Curtis Island LNG Project, Queensland
Client: Bechtel
Package Details
ALPNG Permanent Fire Water Package
Application Permanent Fire Water Pumps (1 x Electric & 2 x Diesel)
Pump FM Split Case Centrifugal Pumps
Duty 562.9 m3/hr @ 105 m
Driver 6.6kV 355 kW Electric & AS2941 350 kW Diesel with accoustic enclosures
Controller AS2941 Controller (Electric & Diesel)
GLNG Temporary Fire Water Pumps
Pump ISO 5199 Centrifugal End Suction Pumps
Duty 200 m3/hr @ 85.13 m
Driver 110 kW Electric & AS2941 110kW Diesel
Controller AS2941 Controller (Electric & Diesel)
Permanent Fire Water Pumps (1 x Electric & 2 x Diesel)
Pump API 610 Centrifugal End Suction
Duty 550 m3/hr @ 110 m
Driver 6.6kV 355 kW Electric & AS2941 350 kW Diesel
Controller AS2941 Controller (Electric & Diesel)
LNG Fire Water Package
Application Fire Water Pumps 3 x diesel driven units
Pump ISO 5199 Centrifugal End Suction Pump
Duty 550 m3/hr @ 105.7 m
Driver AS2941 313kW Diesel
Controller AS2941 Controller (Diesel)